Cast in Situ Piles in Bangladesh Options
As observed from the figure below, constant auger is utilized to drill the borehole, carry up drilled soil, and pour concrete even though the auger is moved up. Subsequently, the borehole doesn't need casing or hydrostatic force to stop damage to the borehole wall.Demolition of the surplus concrete previously mentioned the Slice-off amount shall be